Press

SURFTOWN MUC Groundbreaking Underway for Europe’s First Endless Surf Pool

Munich, July 28, 2022: The construction of SURFTOWN® MUC was announced to the public last year as Europe’s largest surf pool, with overwhelming media attention. Since then, the developers have consistently forged the project ahead, finding solutions for the structural and technical requirements in close cooperation with the responsible authorities. In particular, the self-imposed goal to realize climate-neutral and sustainable concepts required time-consuming approaches and innovative answers. Today, SURFTOWN MUC, featuring Endless Surf technology, celebrates their official groundbreaking with representatives present from the political, business, and surfing communities. Situated close to the Munich Airport at Lilienthalstrasse 12 in Hallbergmoos, the world-class surf park facility is slated to test operations in late 2023 and officially open to the public in the spring of 2024.

Aerial Concept Plan of SURFTOWN MUC featuring Endless Surf wave pool technology
Aerial View of SURFTOWN MUC featuring Endless Surf (Visualization by Maisch Wolf Architekten)

We are thrilled and proud to get closer each day to our dream of surfing near Munich”, says Chris Boehm-Tettelbach, CEO of SURFTOWN® MUC. “My sincere thanks go to the municipality of Hallbergmoos, which has accepted the challenges of our forward-thinking project with remarkable pioneering spirit.

Marking a major milestone for the city, Josef Niedermair, Mayor Hallbergmoos says:

For the municipality, SURFTOWN® MUC is a historic opportunity that everyone can benefit from. On a political level, we have done our best to ensure that this extraordinary project can be realized in our town. Once again we are proving that Hallbergmoos is capable of courageous and forward-thinking steps.”

The SURFTOWN team breaking out the shovels in Munich.

A center for surf lifestyle and community

The organically shaped surf lagoon by Endless Surf technology is 180 meters long and is incredibly flexible when it comes to operating configurations and customizable wave production. Most notably, Endless Surf can produce a “peeling wave” along its entire length, offering up a 20 second ride for surfers. The design of the surrounding buildings picks up the water theme with a reminiscent of the shape of a breaking wave. The overall result is a facility where athletes as well as the general public can look forward to a visit with high recreational value: an outdoor fitness area, a children’s playground and the beach area with many facilities to lay down and relax. In combination with a contemporary gastronomic concept, the complex is intended to convey the special surfing lifestyle that is so attractive for many people. The idea of the developers of SURFTOWN® MUC is also to create a meeting place for the region: from onlookers to employees on their lunch break, from young surfing talents to families and children who want to spend an extraordinary day outdoors. Even International Championships can take place at SURFTOWN MUC, thanks to the flexible wave design with heights from 30cm to 2.5 meters.

At the core of all our planning is the unique surfing experience, which should provide visitors – from absolute novices to Olympians – a safe environment for everything that makes this sport such a passion,” says Chief Surfing Officer Michi Mohr. “And that includes an innovative surf school and coaching concept for beginners, intermediate surfers and pros, in addition to a relaxed and cool ambience and additional outdoor sports facilities.”

Innovative technologies for a sustainable surf park experience

In order to serve the various dimensions of sustainability, different ecological, economic, and social factors were considered for the conception of SURFTOWN® MUC. The overall goal is to make the facility climate-neutral and to focus on renewable energy and water-saving measures:

  • 90 percent of the energy needs of the surfing facility and outbuildings are generated from photovoltaic systems used on the property as well as on an adjacent open space. The remaining electricity needs will be covered by green electricity from the local grid.
  • The design for the facility’s water supply does not use valuable potable water: It feeds on local groundwater, which is abundantly available in Hallbergmoos due to its swampy topography. Special filter systems and a circulating water system are also designed to minimize consumption.
  • To make the arrival and departure of visitors as eco-friendly as possible, public transport passengers and drivers of electric cars, e-scooters and bicycles will be incentivized with a special bonus system. Adequate electronic charging infrastructure in parking lots will also be provided.

Innovative technologies also characterize the wave generator that will be used in SURFTOWN® MUC and forms the heart of the surf park. The artificial waves by Endless Surf are created by a pneumatic chamber system that converts pressure into wave energy. This technologically sophisticated system is provided by attractions industry leading Canadian company WhiteWater for the first time in the world at SURFTOWN® MUC. It can roll out fully customizable peeling waves up to more than two meters in height with a time interval of about ten seconds along the entire length of the pool.

Bringing customizable waves to an already vibrant surf community surrounding the Eisbach River will surely solidify Munich as a surfing hub for Germany and beyond. We’re incredibly honored to contribute to this rich surf culture alongside the dynamic team behind SURFTOWN® MUC. This moment marks a huge milestone for us all and we can’t wait to start rolling out Endless Surf waves in Munich.” – Paul Chutter, President of WhiteWater & Endless Surf

Rainer Maelzer, President of WhiteWater’s European Region team located in Munich speaks highly of the project in saying:

The vision for SURFTOWN® MUC is revolutionary. This is undoubtedly a world-class surf park in the making, and we are thrilled to bring it to life and add to Munich’s growing reputation of being a European powerhouse for action sports. Plus, with our European regional team local to Munich, we’ve got quite a bit of hometown pride for this one.”

Adjacent to SURFTOWN®  MUC, the project developer Rock Capital Group is building the HYBRID ONE lifestyle quarter, unique in Europe, with a boulevard, showrooms, gastronomy, retail as well as ultra-modern and flexible office and laboratory space. The goal: to redefine leisure and work on 30,000 square meters. This portion of the development is scheduled for a 2025 completion, while waves at SURFTOWN MUC will already be pumping.

Share

NEWSLETTER

FOLLOW

Instagram
LinkedIn

RELATED POSTS

无极冲浪湾携手美莎泳池(Myrtha Pools)解决造浪池建造和维护痛点

近日,无极冲浪湾与美莎泳池(Myrtha Pools)宣布建立合作关系,计划缓解冲浪乐园开发商们在其冲浪池的建造和运营过程中经常遇到的诸多问题。在这项激动人心的合作中,无极冲浪湾项目将独家享有美莎泳池先进的不锈钢泳池技术的应用。 美莎泳池 (Myrtha Pools) 成立于1961年,是国际泳池行业领军者。美莎游池在泳池建造领域拥有数十年的经验,曾为众多世界知名度假村和休闲项目服务,并凭借奥运会竞赛泳池项目而广为人知,进入造浪池领域可谓顺势而为。美莎解决方案不采用混凝土结构,而是由不锈钢和层压PVC组成。这对众多天然湖建造而言性价比更高,耐久性更好,并且更具可持续性。此外,美莎解决方案还提供25年质保,证明了其技术的耐久水准。   一个致力于不断创新冲浪公园的合作伙伴关系   无极冲浪湾总裁保罗·查特特意强调了双方建立合作关系的天然契合之处。…
了解更多

加拿大冲浪协会与无极冲浪湾达成官方造浪池合作伙伴关系

重塑加拿大冲浪的未来 本周早些时候,不列颠哥伦比亚省的造浪池技术公司无极冲浪湾宣布与加拿大冲浪协会就冲浪技术达成官方合作伙伴关系。造浪池为冲浪运动带来了深远的影响,通过完全可控的波浪,使重复性训练成为可能。此外,由于冲浪在去年的日本奥运会上已经成为了官方项目,这项运动正在经历飞速的发展。据推测,全球各地的冲浪乐园都在打造新的明星选手和提升现役运动员的技术水平。无极冲浪湾技术在各大洲不断展开开发项目,是当前市场上最具灵活性和可定制性的造浪池技术。                …
了解更多

无极冲浪湾展望2022:欢迎来到冲浪乐园与内陆冲浪之年

欢迎来到2022年。我们正在冲浪世界的内陆冲浪领域,向超棒的一年全速前进。大概一年半前,无极冲浪湾开始了这段旅程,而今年,我们将取得一些重要进展。 翻过一页告别2021年,不得不说是冲浪行业的重要年度。主要归功于在东京夏季奥运会推迟一年后,冲浪运动的首次亮相。世界各地的冲浪运动员聚在一起,在国际舞台上代表着他们的国度及冲浪运动。对冲浪乐园来说,这是个好消息,因为冲浪的需求和热度达到了前所未有的高度。并且,冲浪乐园将来甚至可能成为奥运会冲浪项目的一部分。无论你站在舆论的哪一边,无论比赛是否会在泳池里进行,运动员们几乎都会参与冲浪训练。 2021年不光整体大获成功,尤其是在Endless Surf,我们对去年的成果和为2022年做的准备都很满意 即将开展的项目 随着我们官宣项目的不断增加,2022年和以后有更多值得兴奋的。特别值得注意的是,Surftown MUC宣布将在德国开发项目,而在Parkwood Village开始建造的The Club正准备为澳大利亚黄金海岸的新冲浪高尔夫度假村增设无极冲浪湾。NorthBreak Port…
了解更多